EV Charging
From a single workplace charger to estate-scale rollouts, designed and installed under one accountable team. Funded delivery. Framework-compliant. OZEV routes managed in-house.
What an EV Charging Project Covers
From electrical survey through to usage monitoring, all under one accountable team.
Workplace Charging
Staff and fleet charging. Single bay through to whole-car-park rollouts. AC and DC options. Back-office management for usage reporting.
Commercial and Estate-Scale Charging
Multi-site rollouts across retail estates, leisure portfolios, and industrial parks. One spec, one project team, central reporting.
Grid Capacity and Infrastructure
Site electrical survey, load assessment, DNO liaison. Smart load management where capacity is the constraint.


EV Charging for Schools and Multi-Academy Trusts
Schools install EV charging for three reasons: staff demand, visitor expectation, and alignment with sustainability reporting.
The OZEV workplace charging grant covers a large share of the cost. Funded delivery covers the rest. Installation is scheduled around the school year.
We manage the OZEV application in-house so the grant lands cleanly and the install dates do not slip. We are a fully approved supplier on NEPRO3 (via Bloom), Constellia, and via Crown Commercial Services for direct award procurement.
EV Charging for Commercial and Industrial Estates
Portfolios of sites, fleet conversion programmes, ESG-aligned investment plans, and customer-facing charging at retail and leisure locations.
Portfolio-Level Design
One specification, one supplier, one project team, one reporting line across your full estate.
Sequenced to Your Plan
Site-by-site delivery scheduled to your roll-out plan rather than to the installer's calendar.
Customer-Facing
Retail and leisure charging that puts your brand and uptime at the centre.

How We Deliver
Estate-scale rollouts, OZEV grant applications managed in-house, design through to maintenance under one team.
Estate-scale
Multi-site EV rollouts delivered across UK portfolios.
OZEV-managed
Grant applications run in-house, on the install timeline.
Under one team
Design, install, commission, and maintain.
Why WN1?
At WN1, we’re committed to providing high-quality, sustainable solutions that meet your unique needs.
Delivered results across education, NHS, and industry
Real-world experience with complex organisational needs.

Designed around your operation
Phased to teaching weeks, shift patterns, retail trading, and clinical operations — not the installer's calendar.

One accountable team
Design, fund, install, commission, maintain. One contract, one project team, one sign-off.

What our clients say about us
Real results from organisations across education, healthcare, and industry.
Get StartedPolicies that guide our work. Each policy is documented, regularly reviewed, and accessible to clients who need assurance of our operational integrity.
Covers equipment installation, site procedures, emergency protocols, and staff training requirements.
Addresses waste management, energy efficiency, and sustainable procurement across all operations.
Ensures consistent delivery standards and continuous improvement in all client engagements.
Questions
Find answers to common questions about our approach, timescales, and what to expect.
How long does an assessment take?
Every project starts with a free site survey, covering your fittings, energy consumption, and hours of operation. From that we build your saving model and installation plan before you commit to anything. Timing depends on the size of your site, and we'll confirm a date when you book your free audit.
What’s the typical payback period?
There isn't one to wait for. Sustainable Estates Programme means zero up front cost, so you're not recovering capital, you're paying through the saving the project generates. For LED, savings start the day the new fittings are commissioned. For solar, they appear from your first full billing cycle. We model your specific numbers in the free audit, so you see them before you sign.
Do solutions disrupt daily operations?
No. We schedule around your operation, not the other way round. For schools, that's evenings, weekends, and half-terms. For commercial estates, we phase delivery site by site. For NHS and manufacturing sites, we work around clinical or production schedules.
Which sectors do you work with?
Four: Education, Commercial, NHS, and Manufacturing & Industrial. Each has its own procurement route and operational rhythm, and we deliver to fit it.
Ready to start your sustainability journey?
Let's talk about what's possible for your organisation. Our team is ready to listen and advise.
%20(1).png)