Solar PV
Transition to clean energy and reduce your carbon footprint with no upfront cost
What a Solar PV Project Covers
From structural survey through to performance monitoring, all under one accountable team.
Commercial Solar Install
Roof-mount and ground-mount arrays sized to your annual consumption profile. Structural and electrical surveys, planning, and DNO applications managed in-house.
Battery Storage
Battery sizing modelled against your consumption profile. Specified where the payback model justifies it, not by default.
Monitoring and Maintenance
Performance monitoring against the design yield. Aftercare contracts and warranty management.


Solar PV for Schools and Multi-Academy Trusts
Schools and trusts approach solar with three constraints: capital budget, planning and structural complexity, and the academic calendar. We work around all three.
We offer comprehensive solar panel solutions for schools, including funding, design, installation, operation, and an education package about energy and sustainability.
Funded delivery through Sustainable Estates Programme removes the capital outlay. We handle DNO and planning in-house. Installation is scheduled to summer holidays where possible and around teaching weeks where not.
We are a fully approved supplier on NEPRO3 (via Bloom Procurement Services), the Constellia Framework, and via Crown Commercial Services. Public sector buyers can procure under direct award without going to open tender.
Solar PV for Commercial and Industrial Estates
ESG reporting, net zero commitments, energy cost reduction, and resilience against grid pricing.
Site or Estate Scale
Single-building installations to multi-site rollouts, co-ordinated centrally with one project team.
Bills Land Lower
Lower bills from the first full billing cycle. ESG metrics shift from the first commissioning date.
Capital-Free Routes
Funded delivery removes the capital question. ESG-aligned. Finance-team-approved.

Vantage CE Academy Trust
Multi-site solar across the trust estate. 119 tons CO₂ reduced annually. Zero initial expenses through Sustainable Estates Programme.
119 tons
Annual CO₂ reduction across the Vantage CE estate.
Multi-site
Solar PV deployed across the Vantage CE trust estate.
Zero
Initial expenses through Sustainable Estates Programme.
Why WN1?
At WN1, we’re committed to providing high-quality, sustainable solutions that meet your unique needs.
Delivered results across education, NHS, and industry
Real-world experience with complex organisational needs.

Designed around your operation
Phased to teaching weeks, shift patterns, retail trading, and clinical operations — not the installer's calendar.

One accountable team
Design, fund, install, commission, maintain. One contract, one project team, one sign-off.

What our clients say about us
Real results from organisations across education, healthcare, and industry.
Get StartedPolicies that guide our work. Each policy is documented, regularly reviewed, and accessible to clients who need assurance of our operational integrity.
Covers equipment installation, site procedures, emergency protocols, and staff training requirements.
Addresses waste management, energy efficiency, and sustainable procurement across all operations.
Ensures consistent delivery standards and continuous improvement in all client engagements.
Questions
Find answers to common questions about our approach, timescales, and what to expect.
How long does an assessment take?
Every project starts with a free site survey, covering your fittings, energy consumption, and hours of operation. From that we build your saving model and installation plan before you commit to anything. Timing depends on the size of your site, and we'll confirm a date when you book your free audit.
What’s the typical payback period?
There isn't one to wait for. Sustainable Estates Programme means zero up front cost, so you're not recovering capital, you're paying through the saving the project generates. For LED, savings start the day the new fittings are commissioned. For solar, they appear from your first full billing cycle. We model your specific numbers in the free audit, so you see them before you sign.
Do solutions disrupt daily operations?
No. We schedule around your operation, not the other way round. For schools, that's evenings, weekends, and half-terms. For commercial estates, we phase delivery site by site. For NHS and manufacturing sites, we work around clinical or production schedules.
Which sectors do you work with?
Four: Education, Commercial, NHS, and Manufacturing & Industrial. Each has its own procurement route and operational rhythm, and we deliver to fit it.
Ready to start your sustainability journey?
Let's talk about what's possible for your organisation. Our team is ready to listen and advise.
%20(1).png)